Photo of Road Construction

Below are lists of construction projects planned and scheduled by the Township for the 2019 season.  

To view current and upcoming road closures and delays, visit https://www.algonquinhighlands.ca/residents/road-closures---delays.php.

Dorset Area

A slurry seal surface treatment will be applied to the following roads to help extend the life of the road surface:

  • Camp Dorset Road
  • Harvey Ave East
  • Russel Landing Road

Stanhope Area

A slurry seal surface treatment will be applied to the following roads to help extend the life cycle of the road surface:

  • Airport Road
  • Barry Line Road
  • Green Lake (Only to the Township boundary)
  • Big Hawk Lake Road
  • Old Mill Road

Complete road reconstruction project will be taking place on the Walkers Line Road. This project will start Wednesday May 15 and continue to October 1, 2019, the scope or work will consist of the following;

  • Ditching and shouldering
  • Culvert replacement / resetting
  • Road surface pulverization
  • Gravel application / road grading
  • Double surface treatment

In collaboration with the County of Haliburton there is a large culvert on Halls Lake West scheduled to be replaced. The scope of work will consist of the following;

  • Culvert replacement
  • Bank stabilization
  • Road realignment
  • Road resurfacing over culvert

Please expect delay's and be patience when driving through construction zones.

Contact Information

Adam Thorn                                                                          
Operations Manager
Phone: 705-489-2379
E-mail: athorn@algonquinhighlands.ca

Stanhope Public Works Yard
1095 North Shore Road
Phone:  705-489-2600

Dorset Public Works Yard
1850 Kawagama Lake Road
Phone:  705-766-2912